Commercial

Manufacturing Facility Solar

Windsor, ON
250 kW System
Completed February 2023

Large manufacturing facility solar installation reducing production costs significantly.

Share this project:
Manufacturing Facility Solar
1 / 3
250 kW
System Size
625
Solar Panels
300,000 kWh
Annual Production
25 years
Warranty

The Challenge

High-energy manufacturing process needed cost reduction without compromising production capacity.

Our Solution

250 kW ground-mount system with battery storage for demand charge reduction and power reliability.

Results Achieved

  • $45,000 annual energy savings
  • 50% demand charge reduction
  • Production capacity maintained
  • 3-year payback period

Installation Timeline

From consultation to activation

1-2 weeks

Consultation & Design

Initial site assessment, energy analysis, and custom system design

1
2-4 weeks

Permits & Approvals

Securing all necessary permits and utility approvals

2
1-3 days

Installation

Professional installation of panels, inverters, and electrical systems

3
1-2 weeks

Inspection & Commissioning

Final inspections, testing, and system activation

4
4-8 Weeks
Typical Total Project Duration

Environmental Impact

Making a difference for our planet

39.0 tons
CO₂ Offset Annually

Reducing greenhouse gas emissions equivalent to removing cars from the road

1950
Trees Planted

Carbon absorption equivalent to planting and growing mature trees

8.5
Cars Off the Road

Equivalent to removing gasoline-powered vehicles from the road for a year

Additional Benefits

100%
Clean Energy
0
Air Pollution
0
Water Usage
25+
Years Production
Produces
300,000 kWh/year
Offsets
39.0 tons CO₂

Ready for Your Own Solar Installation?

Let us design a custom solar solution for your property. Get a free quote and join hundreds of satisfied customers across Canada.